Case Study – Boston Scientific

THE PROJECT

Boston Scientific

The first step of this project was to upgrade the boiler on site. This generated savings of over 490,000 kWh per year. After the upgrade of the boiler, the cooling system on site also required upgrades. 

After the completion of these upgrades, the HVAC system was refurbished. This project allowed savings of 218,641 kWh per year.

Boston Scientific
Boost Efficiency: Case Study of Manufacturing Plant

The Solution

The on site management then continued by upgrading the lighting on site from halogen and fluorescent lighting to LED fittings. The savings found as a result of this project were 64,744 kWh.

The pumps on site were also improved before a BMS system was installed on site to allow for the accurate monitoring and regulation of the building’s electrical power usage.

Services Provided

Each project is unique and requires a tailored approach.  Here are some of the services we provided on this project.

Detailed Full Site Energy Audit

We first needed to establish the current state of the energy usage to guage the immediate priorities.

Working Design

As part of the discovery phase, we gathered important data and metrics to help us decide on the best course of action.

Efficiency Solution Design

We designed a system which would enable the most efficient use of energy going forward.

Management of Project Planning

We managed the project planning throughout the whole process utilising our tried and tested workflow.

Procurement Management

We researched the best suppliers for the different elements that we thought would benefit the project.

Complete Engineering Support During all Phases

Our years of experience in Engineering allowed us to support all phases of the project.

Site Installation, Safety Management & Quality Surveillance

The next phase was to oversee the installation of our recommended items, taking care with safety.

Project Commissioning, Verification & Warranty Servi

Finally, the project required us to commission verified & certified companies to carry out our recommendations.

Key Achievements

969k
kWh Annual Energy Savings

Energy Savings Achieved

The energy savings of 969 thousand kWh were achieved through a number of smaller projects such as a boiler upgrade and HVAC upgrades.

€75k
Annual Cost Savings

Additional Benefits

The BMS provides useful information on the building and allows for the company to make better decisions about their energy usage.

1159kg
Annual Co2 Savings

Successful Upgrades

A number of successful upgrades were installed including  upgrades to the boiler, cooling, HVAC, lighting, pumps and BMS.